During the construction and installation process, on-site training shall be conducted to ensure that the operator is familiar with the device. After completion of the installation, centralised training will be carried out and, after the assessment, they will work with certificates and participate in the project launch. The designer shall provide training programmes and operating instructions, and operators shall work under the direction of the designer until they are qualified to operate. Then modify the handling instructions and use them on the pig farm so that the operator is competent in handling and analysis and can deal with typical malfunctions.<br>
正在翻译中..